Plant Tour


Welcome to the Triton plant tour.
I toured the plant on August 14th. and was greeted at the main office by
Johnny Johnson "Southeastern Sales Representative"
I found Johnny to be very well versed and a total believer in the product he represents.
He answered every question I asked and never hurried our tour "two hours" in any way.

In this tour of pictures I hope I can convey the quality of workmanship that is built into every Triton boat. The ultra modern 170.000 s.f. plant and soon another 60.000 s.f. addition is completely air conditioned and heated to insure proper curing of each boat.
The first thing I noticed as we entered the plant area was how clean and neat everything looked. You would expect a plant of this size to have a little dirt somewhere.
About the only thing I could add to this tour would be a plane ticket and a motel room should come with each new boat so everyone would have the opportunity to tour the plant and see the quality that is built into each new Triton.



"Click On Pictures"


#1

Stringer System

#2
Taping
Mold


#3
Prepared
Hull


#4
Hull
Section


#5
Top
Cap


#6
Top
Cap


#7
Installing
Top Cap

#8
Rigging
Area

#9
Shipping
Area

#10
Assembly
Plant