
Plant Tour
#7
Top Cap Installation

This is a photo of a top cap installed on the hull it followed down line.
Once installed the cap can not be removed from the hull again.
![]()
Plumbing Installation

Plumbing for the bilge pumps and livewells are installed before the boat moves to the final rigging area.
![]()