Plant Tour
#8
Rigging Area
At this point the boats are waxed and cleaned before going to final rigging.
Carpet Installation
Carpet is installed on top deck and lockers.
Final Assembly
Once carpet is installed the boat is moved to the final installation area where all electrical and boat options are added.
Final Assembly
More photos of final assembly area.
Final Inspection
Each boat is inspected here to make sure everything is working properly and all options have been installed.
Final Inspection
More photos of final inspection area.
Final Inspection Water Test
Before each boat is moved out the door to the shipping area it is water tested to make sure there are No leaks in any of the plumbing fixtures or hull.